Services Hardwood floor installation
Hardwood floor installation in Virginia
Solid and engineered boards laid room by room, with the old floor covering taken up first.

How the work goes
We take up the old carpet, vinyl or laminate, check the base for flatness and fix low spots with leveling compound or shims. Then underlayment goes down and the boards are racked out across the room so the joints fall naturally.
Solid boards are nailed down. Engineered boards are nailed, stapled or glued depending on the product and the floor underneath.
In older houses
Many homes around here have rooms that are a little out of square. We start the first row on a straight line, not on the wall, so the boards run true down a long hall and the gap hides under the baseboard.
Prefinished or site finished
Most customers choose prefinished boards because the room is usable the same day. We talk through species, width and color with samples at the estimate visit.
Questions about hardwood floor installation
Can you match the boards in the next room?
We bring samples to get as close as we can in width and color. An exact match with an old floor is not always possible, so we may suggest a threshold at the doorway.
Do I need to empty the room?
Please clear small items and breakables. We can talk about moving larger furniture at the estimate visit.
How long does a room take?
A typical bedroom is often done in a day or two. The written estimate lists the expected time for your rooms.
Planning this for your home?
Send the address, the rooms and the floor you have in mind. We reply by phone or email to set up a visit and a written estimate.
Illustration
Illustration
Illustration